Dholera SIR has crossed several critical milestones in 2025, signalling a shift from planning to visible, on-ground development. The Dholera International Airport runway construction is now 60% complete, with the terminal building foundation laid in Q1 2025.
The DMIC Expressway connecting Ahmedabad to Dholera has seen rapid progress, with 4 of 6 lanes now operational. This has reduced travel time from Ahmedabad to under 90 minutes.
Zone 2 now has fully operational water supply, drainage, and electrical infrastructure. Zone 4 road networks are 70% complete, and Zone 6 has begun utility corridor construction.
The Tata Semiconductor fabrication facility — a ₹91,000 crore investment — has commenced foundation work, bringing with it the promise of thousands of direct and indirect jobs.
For investors, this means Dholera has officially transitioned from a speculative opportunity to a utility-driven, infrastructure-backed investment destination.
Book a free consultation with our team to discuss how Dholera fits your investment portfolio.
Book a ConsultationShare this article:
Share your details and our team will call you with current availability and guidance.